close

Omsk

74 Mayakovskogo st.
Mon-Fri from 8:00 to 17:00, Sat-Sun day off

Heat carrier heater From 1 000 000 ₽

In stock and made to order, delivery across Russia within 3 days

Calculate the price

In-house production

Own machinery and
over 3500 m2 production facilities.

Price

Our products have
the best value-for-money ratio

Quality

We use components from the leading European manufacturers

Experience

Extensive experience in Bitumen tank farm construction

Products in stock

Always in stock,
delivery across Russia within 3 days

Warranty

Equipment warranty
up to 24 months

A heat carrier heater is designed for heating heat carrier (oil) and feeding it into the heating registers of bitumen facilities/depots with further warming, heating to the required temperatures of bituminous binders.
 

The unit is a steel cylinder course with two coaxial pipe spirals composing a boiler with a three-way furnace chamber.


The back one is solid and the front one is hinged, walls are lined with fire castable. There’s 100 mm thermal insulation with a galvanized steel covering proofing outside the boiler. A Weishaupt burner (Germany) is installed on the front wall.

Turn-key production

Stage 1

Production

Own machinery and
over 3500 m2 production facilities.
Learn more about production

Stage 2

Installation

This is a maximum version of the unit with minimum installation effort. Only a gas or diesel connection is required.

Stage 3

Commissioning

Commissioning is carried out by the specialists of Promservis LLC. Launch and introduction into service take up to 3 days. Useful life – at least 12 years. Warranty period – 18 months.

Production process

The heat carrier heater production process involves several stages:
 

  1. Producing a heat carrier heater register.

     
  2. Producing a furnace.
     
    Installation of coolant heating - 1
    Installation of coolant heating - 2

     
  3. Heat sealing the boiler.
     
    Installation of coolant heating - 3
    Installation of coolant heating - 4

     
  4. Installing instrumentation and controls and a thermal oil pump, Germany.
     
    Installation of coolant heating - 5
    Installation of coolant heating - 5
    Installation of coolant heating - 6

     
  5. Connecting a burner (Weishaupt brand, Germany).
     
    Installation of coolant heating - 7
    Installation of coolant heating - 8
    Installation of coolant heating - 9

     
  6. Boiler load test (within 48 h the unit is being tested at max values: to 240 degrees by the heat carrier, pressure 6 atm).
     
    Installation of coolant heating - 10
    Installation of coolant heating - 11
     


Heat carrier heater basic specifications

 

Name

Type-size

НТ-35

НТ-50

НТ-100

НТ-150 НТ-200 НТ-250
Brand

ПС

22.84.00.000

ПС

20.01.00.000

ПС

21.30.00.000

ПС

219.01.00.000

ПС

ПС

Max heating capacity, kW

500

700

1000

1500

2000

2500

Burner capacity, kW min/max

100/590

192/814

232/1163

372/1512

470/2290

600/2650

Max heat carrier operating

pressure, MPa

0,6

0,6

0,6

0,6

0,6

0,6

Power consumption, kW

7

11

14

14

18,5

22

Circulation pump

capacity, m3/h

30

40

50

70

100

120

Minimum heat carrier amount

in the system, l

1000

1000

1000

1000

1500

1500

Maximum heat carrier amount

in the system, l

4000

7000

10000

15000

20000

25000

Maximum heat carrier heatingнагрева

temperature, 0C0С
 

250 250 250 250 250 250
 
 
Heat carrier heater package contents
 

#

Name

Quantity

1

Furnace

1

2

Feeding unit

1

3

Expansion main tank

1

4

Weishaupt burner

1

5

Control cabinet

1

6

Alarm module

1

7

Chimney

1

8

Connecting cable kit

1

9

Installation kit

1

10

Documentation kit

 
 Installation of coolant heating - 12

Feeding unit – a 1,2 m3 container with a gear oil pump enabling filling and discharging of heat carrier from the system. A 1,2 m3 expansion tank is installed 1 meter higher than the max point of heat carrier circulation. As a heat carrier, machine oil I-40А or АМТ-300 is used, which allows heating bitumen to the required temperature. KSB circulation pump, Germany, filter, valves EU and control cabinet are located parallel to the in-frame boiler.

 

The unit control circuit ensures the safe operation due to three independent channels of heat carrier temperature and exhaust gas control, two independent channels of heat carrier flow and heat carrier pressure control, the automated overload protection system. The high efficiency and reliable operation of the unit are ensured by a wide implementation of automated control systems, as well as the use of components from leading world manufacturers.

 

For today, over 500 units of different modifications were manufactured, which successfully operate across Russia and the CIS.

 

The average service life of a heat carrier heater is at least 10 years.

The unit has a compliance certificate and approval documents for gas:

Давление газа от 150 mbar до 360 mbar.
Диаметр подводящего трубопровода – 50 мм.
Всё изготавливаемое оборудование имеет разрешительные документы на газ,
ГОСТ Р и ТР ТС как в России, так и зарубежом.
Сертификат соответствия Декларация горелки ТР ТС 010 Декларация соответствия ЕЭС - нагреватель теплоносителя Сертификат горелки ТР ТС 016_приложение

More than200

projects
implemented in Russia
and the CIS

Installing a heating medium heater

Installing a heating medium heater

c.Ekaterenburg

Installing a heating medium heater

Installing a heating medium heater

c.Kazan

Installing a heating medium heater

Installing a heating medium heater

c.Moskva

Installing a heating medium heater

Installing a heating medium heater

c.Aktobe

Installing a heating medium heater

Installing a heating medium heater

c.Magadan

Heat carrier heating unit

Heat carrier heating unit

Heat carrier heating unit

Heat carrier heating unit

We are ready to provide

Repair

Demounting

Maintenance

Any questions?

Leave a request and we’ll contact you
as soon as possible